2025 · Brazil · Completed
Port of Santos–São José do Rio Preto HyperPort study
Published freight study for a 549 km container corridor through São Paulo and Campinas, framed as a feasibility result.

Library · Feasibility evidence
Completed and published hyperloop feasibility studies, separated from announcements and concept work. A study is not an approved or funded project.
Completed evidence
Only studies with a publicly traceable result are included. Commissioned, announced and concept work remains in the library.
2025 · Brazil · Completed
Published freight study for a 549 km container corridor through São Paulo and Campinas, framed as a feasibility result.
2024 · Belgium / Netherlands / Luxembourg / Germany · Published report
Public cross-border study of industrial-cluster potential and a first proof-of-concept line for passengers and freight.
2023–2025 · Italy · Completed
Public outcome of Phase 1 covering transport demand, engineering, safety, energy and the proposed certification track. Later phases remain subject to activation and funding.
2021–2022 · Belgium · Published report
Sector and route assessment covering Flemish industrial capability and a possible Antwerp–Mechelen–Brussels corridor.
2021 · Brazil · Completed
Completed assessment of a 137 km passenger and cargo corridor via Novo Hamburgo and Gramado, published with the state government and UFRGS.
2021 · Canada · Completed
Published feasibility results and public summary for the proposed Alberta passenger and freight corridor.
2020–2021 · Canada · Published report
Government-commissioned assessment of technical, economic, environmental, safety and regulatory feasibility across competing system concepts.
2020 · United States · Published report
Public corridor study covering Chicago, Fort Wayne, Columbus and Pittsburgh, with passenger, freight, route, cost and benefit analysis.
2019–2020 · United States · Published report
Public 160+ page assessment of the Chicago–Cleveland–Pittsburgh passenger and freight corridor, prepared to U.S. transport-planning guidance.
2018–2019 · India · Completed
Government record for the project-development process following detailed feasibility work.
2018 · United States · Completed
Completed assessment of the Kansas City–Columbia–St. Louis corridor — a study, not a built line.
2017 · United Arab Emirates · Completed
Company-published technical and economic route assessment in desert conditions.
2017 · Netherlands · Published report
Government-referenced feasibility work on a Dutch high-speed test facility and the country’s possible role in hyperloop development.
2017 · United Kingdom · Published report
Government science review of system feasibility, missing data, safety and the work required before deciding on routes.
2016–2017 · Netherlands · Completed
BAM’s public record states that the partners completed an economic feasibility study for a hyperloop on the former Zuiderzeelijn corridor before developing the Delft test facility.
2016 · Finland / Sweden · Published report
Public pre-feasibility summary for a roughly 500 km Baltic connection, including route, demand, cost and wider-economic-benefit assumptions.
2016 · Russia / China · Completed
Official Russian transport-ministry record of study results for a freight link between the Hunchun logistics centre and Zarubino port.
Method
Inclusion does not imply construction approval, funding, procurement or a commercial service.
A study is included when a publicly traceable result exists. Commissioned, announced and concept work remains in the library.