Library · Feasibility study · 2016
Stockholm–Helsinki pre-feasibility study
Public pre-feasibility summary for a roughly 500 km Baltic connection, including route, demand, cost and wider-economic-benefit assumptions.
The record

- Type
- Feasibility study
- Year
- 2016
- Publisher
- FS Links / KPMG / Ramboll / Setterwalls · Hyperloop One technology reference
- Jurisdiction
- Finland / Sweden
- Verified on
- 29 Jul 2026
