Installations · Italy · Planned
Hyper Transfer Test Track
Planned ~10 km certification and test track following the completed feasibility study; commercial line subject to further approvals.
The record
- Operator
- HyperloopTT / Webuild / Leonardo / Hyperloop Italia / CAV
- Location
- Venice–Padua corridor, Veneto
- Status
- Planned
- Type
- Pilot line · Test track
- Length
- 10000 m
- Verified on
- 31 Jul 2026
